Tangent DR over Calapooia River
FairLinn County, Oregon · 020 MI W HWY 99E · Structure no. 20257 012200203
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 121 ft
- 1 main span
- Daily traffic
- 469
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Tangent DR over Calapooia River is a prestressed concrete box beam or girders - multiple carrying Tangent DR over Calapooia River in Linn County, Oregon. It was built in 2008, so it is 17 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 469 vehicles a day, roughly 10% of them trucks, projected to reach 647 by 2041. The structure is 121 ft (36.9 m) long and 32 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tangent DR over Calapooia River built?
It was built in 2008, making it 17 years old in 2025.
What condition is Tangent DR over Calapooia River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Tangent DR over Calapooia River carry?
About 469 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Tangent DR over Calapooia River?
The structure is 121 ft (36.9 m) long with a longest span of 121 ft (36.9 m) and a deck 32 ft wide.
Who owns Tangent DR over Calapooia River?
It is owned by the County Highway Agency.