Linn West DR over Sodom Ditch
FairLinn County, Oregon · 055MI East Shedd · Structure no. 12553A002600308
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 121 ft
- 1 main span
- Daily traffic
- 1,133
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Linn West DR over Sodom Ditch is a prestressed concrete box beam or girders - multiple carrying Linn West DR over Sodom Ditch in Linn County, Oregon. It was built in 1977, so it is 48 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,133 vehicles a day, roughly 20% of them trucks, projected to reach 1,596 by 2041. The structure is 121 ft (36.9 m) long and 33 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Linn West DR over Sodom Ditch built?
It was built in 1977, making it 48 years old in 2025.
What condition is Linn West DR over Sodom Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Linn West DR over Sodom Ditch carry?
About 1,133 vehicles per day (2021 count), of which roughly 20% are trucks.
How long is Linn West DR over Sodom Ditch?
The structure is 121 ft (36.9 m) long with a longest span of 84 ft (25.6 m) and a deck 33 ft wide.
Who owns Linn West DR over Sodom Ditch?
It is owned by the County Highway Agency.