River DR over Albany-Santiam Canal
FairLinn County, Oregon · 020 Miles East CR 719 · Structure no. 11968 071900231
- Built
- 1966
- 59 years old, rebuilt 1999
- Condition
- Fair
- inspected June 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 91 ft
- 3 main spans
- Daily traffic
- 850
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
River DR over Albany-Santiam Canal is a prestressed concrete slab carrying River DR over Albany-Santiam Canal in Linn County, Oregon. It was built in 1966 and reconstructed in 1999, so it is 59 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 850 vehicles a day, roughly 10% of them trucks, projected to reach 1,184 by 2041. The structure is 91 ft (27.7 m) long and 32 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was River DR over Albany-Santiam Canal built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1999.
What condition is River DR over Albany-Santiam Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does River DR over Albany-Santiam Canal carry?
About 850 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is River DR over Albany-Santiam Canal?
The structure is 91 ft (27.7 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.
Who owns River DR over Albany-Santiam Canal?
It is owned by the County Highway Agency.