County RD 721 over South Santiam River
FairLinn County, Oregon · 0.25 NE of Waterloo · Structure no. 02287A072100480
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 349 ft
- 3 main spans
- Daily traffic
- 1,854
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 721 over South Santiam River is a steel continuous stringer/multi-beam or girder carrying County RD 721 over South Santiam River in Linn County, Oregon. It was built in 1961, so it is 64 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,854 vehicles a day, roughly 10% of them trucks, projected to reach 2,575 by 2041. The structure is 349 ft (106.4 m) long and 33 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 721 over South Santiam River built?
It was built in 1961, making it 64 years old in 2025.
What condition is County RD 721 over South Santiam River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does County RD 721 over South Santiam River carry?
About 1,854 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is County RD 721 over South Santiam River?
The structure is 349 ft (106.4 m) long with a longest span of 160 ft (48.8 m) and a deck 33 ft wide.
Who owns County RD 721 over South Santiam River?
It is owned by the County Highway Agency.