No. Terry Street over A-2 Channel
FairLane County, Oregon · 0.5 MI N Barger Ave. · Structure no. 40059 000
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected May 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 64 ft
- 1 main span
- Daily traffic
- 4,539
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
No. Terry Street over A-2 Channel is a prestressed concrete slab carrying No. Terry Street over A-2 Channel in Lane County, Oregon. It was built in 1981, so it is 44 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,539 vehicles a day, roughly 3% of them trucks, projected to reach 5,224 by 2025. The structure is 64 ft (19.5 m) long and 56 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was No. Terry Street over A-2 Channel built?
It was built in 1981, making it 44 years old in 2025.
What condition is No. Terry Street over A-2 Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does No. Terry Street over A-2 Channel carry?
About 4,539 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is No. Terry Street over A-2 Channel?
The structure is 64 ft (19.5 m) long with a longest span of 63 ft (19.2 m) and a deck 56 ft wide.
Who owns No. Terry Street over A-2 Channel?
It is owned by the City or Municipal Highway Agency.