US Bridges

Hilyard ST over Mill Race Canal

Good

Lane County, Oregon · Eugene Hilyard Mill R · Structure no. 40031 000 00011

Built
1962
63 years old
Condition
Good
inspected May 2023
Type
Slab
Prestressed Concrete
Length
27 ft
1 main span
Daily traffic
16,502
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hilyard ST over Mill Race Canal is a prestressed concrete slab carrying Hilyard ST over Mill Race Canal in Lane County, Oregon. It was built in 1962, so it is 63 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,502 vehicles a day, roughly 10% of them trucks, projected to reach 26,723 by 2025. The structure is 27 ft (8.2 m) long and 56 ft wide.

CarriesHilyard ST
CrossesMill Race Canal
LocationEugene Hilyard Mill R
RouteCity Street U1090
StateOregon
Coordinates44.04843, -123.08211
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.7 US tons
Inventory rating30.8 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span26 ft (7.9 m)
Deck width56 ft (17.1 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,502 (2020)
Projected traffic26,723 by 2025
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hilyard ST over Mill Race Canal built?

It was built in 1962, making it 63 years old in 2025.

What condition is Hilyard ST over Mill Race Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Hilyard ST over Mill Race Canal carry?

About 16,502 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Hilyard ST over Mill Race Canal?

The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.9 m) and a deck 56 ft wide.

Who owns Hilyard ST over Mill Race Canal?

It is owned by the City or Municipal Highway Agency.