Pioch Lane over Parson Creek
FairLane County, Oregon · 018 MI W Marcola · Structure no. 39C171196700012
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 64 ft
- 3 main spans
- Daily traffic
- 151
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Pioch Lane over Parson Creek is a prestressed concrete slab carrying Pioch Lane over Parson Creek in Lane County, Oregon. It was built in 1976, so it is 49 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 151 vehicles a day, roughly 10% of them trucks, projected to reach 176 by 2025. The structure is 64 ft (19.5 m) long and 24 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pioch Lane over Parson Creek built?
It was built in 1976, making it 49 years old in 2025.
What condition is Pioch Lane over Parson Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Pioch Lane over Parson Creek carry?
About 151 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Pioch Lane over Parson Creek?
The structure is 64 ft (19.5 m) long with a longest span of 24 ft (7.3 m) and a deck 24 ft wide.
Who owns Pioch Lane over Parson Creek?
It is owned by the County Highway Agency.