US Bridges

HWY 069 over I-5 (hwy 001)

Good

Lane County, Oregon · MP 12.76 · Structure no. 22125 069 01276

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
268 ft
2 main spans
Daily traffic
13,612
2022 count
Owner
State
State Highway Agency

About this bridge

HWY 069 over I-5 (hwy 001) is a prestressed concrete continuous stringer/multi-beam or girder carrying HWY 069 over I-5 (hwy 001) in Lane County, Oregon. It was built in 2017, so it is 8 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,612 vehicles a day, roughly 6% of them trucks, projected to reach 17,950 by 2042. The structure is 268 ft (81.7 m) long and 31 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesHWY 069
CrossesI-5 (hwy 001)
LocationMP 12.76
RouteState Highway 569
StateOregon
Coordinates44.08385, -123.04671
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating57.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length268 ft (81.7 m)
Longest span139 ft (42.4 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,612 (2022)
Projected traffic17,950 by 2042
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY 069 over I-5 (hwy 001) built?

It was built in 2017, making it 8 years old in 2025.

What condition is HWY 069 over I-5 (hwy 001) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does HWY 069 over I-5 (hwy 001) carry?

About 13,612 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is HWY 069 over I-5 (hwy 001)?

The structure is 268 ft (81.7 m) long with a longest span of 139 ft (42.4 m) and a deck 31 ft wide.

Who owns HWY 069 over I-5 (hwy 001)?

It is owned by the State Highway Agency.