US Bridges

Division Ave over West Bank Trail

Good

Lane County, Oregon · NW of Willamette River · Structure no. 21408 000 00000

Built
2011
14 years old
Condition
Good
inspected May 2023
Type
Slab
Prestressed Concrete
Length
26 ft
1 main span
Daily traffic
238
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Division Ave over West Bank Trail is a prestressed concrete slab carrying Division Ave over West Bank Trail in Lane County, Oregon. It was built in 2011, so it is 14 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 238 vehicles a day, projected to reach 272 by 2025. The structure is 26 ft (7.9 m) long and 40 ft wide.

CarriesDivision Ave
CrossesWest Bank Trail
LocationNW of Willamette River
RouteCity Street 0
StateOregon
Coordinates44.09758, -123.10968
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating68.2 US tons
Inventory rating52.5 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic238 (2020)
Projected traffic272 by 2025
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Division Ave over West Bank Trail built?

It was built in 2011, making it 14 years old in 2025.

What condition is Division Ave over West Bank Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Division Ave over West Bank Trail carry?

About 238 vehicles per day (2020 count).

How long is Division Ave over West Bank Trail?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 40 ft wide.

Who owns Division Ave over West Bank Trail?

It is owned by the City or Municipal Highway Agency.