US Bridges

Pioneer Parkway over Scs Channel #6

Good

Lane County, Oregon · Near Pioneer Pk & U St. · Structure no. 21110 000 00000

Built
2009
16 years old
Condition
Good
inspected August 2024
Type
Slab
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
140
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pioneer Parkway over Scs Channel #6 is a prestressed concrete slab carrying Pioneer Parkway over Scs Channel #6 in Lane County, Oregon. It was built in 2009, so it is 16 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 140 vehicles a day, projected to reach 160 by 2025. The structure is 35 ft (10.8 m) long and 12 ft wide.

CarriesPioneer Parkway
CrossesScs Channel #6
LocationNear Pioneer Pk & U St.
RouteCity Street 0
StateOregon
Coordinates44.06777, -123.0276
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.8 US tons
Inventory rating32.2 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length35 ft (10.8 m)
Longest span32 ft (9.8 m)
Deck width12 ft (3.7 m)
Roadway width11 ft (3.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic140 (2020)
Projected traffic160 by 2025
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pioneer Parkway over Scs Channel #6 built?

It was built in 2009, making it 16 years old in 2025.

What condition is Pioneer Parkway over Scs Channel #6 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Pioneer Parkway over Scs Channel #6 carry?

About 140 vehicles per day (2020 count).

How long is Pioneer Parkway over Scs Channel #6?

The structure is 35 ft (10.8 m) long with a longest span of 32 ft (9.8 m) and a deck 12 ft wide.

Who owns Pioneer Parkway over Scs Channel #6?

It is owned by the City or Municipal Highway Agency.