US Bridges

Crestview ST over UPRR

Fair

Lane County, Oregon · Crestview Oxing Oakridge · Structure no. 19020 000 00010

Built
1972
53 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
325 ft
1 main span
Daily traffic
3,782
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Crestview ST over UPRR is a steel stringer/multi-beam or girder carrying Crestview ST over UPRR in Lane County, Oregon. It was built in 1972, so it is 53 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,782 vehicles a day, roughly 5% of them trucks, projected to reach 4,352 by 2025. The structure is 325 ft (99.1 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCrestview ST
CrossesUPRR
LocationCrestview Oxing Oakridge
RouteCounty Highway 0
StateOregon
Coordinates43.74683, -122.46706
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating26.5 US tons
Inventory rating20.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+4 approach)
Design loadHS 20
Structure length325 ft (99.1 m)
Longest span100 ft (30.5 m)
Deck width39 ft (11.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,782 (2020)
Projected traffic4,352 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Crestview ST over UPRR built?

It was built in 1972, making it 53 years old in 2025.

What condition is Crestview ST over UPRR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Crestview ST over UPRR carry?

About 3,782 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Crestview ST over UPRR?

The structure is 325 ft (99.1 m) long with a longest span of 100 ft (30.5 m) and a deck 39 ft wide.

Who owns Crestview ST over UPRR?

It is owned by the City or Municipal Highway Agency.