HWY 69 over UPRR & NW Expressway
FairLane County, Oregon · 00.5 N JCT HWY 01W · Structure no. 08864A069 00706
- Built
- 1963
- 62 years old, rebuilt 1971
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 547 ft
- 3 main spans
- Daily traffic
- 55,046
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 69 over UPRR & NW Expressway is a steel continuous stringer/multi-beam or girder carrying HWY 69 over UPRR & NW Expressway in Lane County, Oregon. It was built in 1963 and reconstructed in 1971, so it is 62 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 55,046 vehicles a day, roughly 9% of them trucks, projected to reach 69,400 by 2042. The structure is 547 ft (166.7 m) long and 102 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 69 over UPRR & NW Expressway built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1971.
What condition is HWY 69 over UPRR & NW Expressway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does HWY 69 over UPRR & NW Expressway carry?
About 55,046 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is HWY 69 over UPRR & NW Expressway?
The structure is 547 ft (166.7 m) long with a longest span of 135 ft (41.1 m) and a deck 102 ft wide.
Who owns HWY 69 over UPRR & NW Expressway?
It is owned by the State Highway Agency.