US Bridges

Road over Salmon CR

Fair

Lane County, Oregon · 3.1 NE JCT 58-FS 24-.2 SE · Structure no. 061808000001369

Built
1979
46 years old
Condition
Fair
inspected November 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
113 ft
1 main span
Daily traffic
5
2006 count
Owner
Federal
U.S. Forest Service

About this bridge

Road over Salmon CR is a prestressed concrete box beam or girders - multiple carrying Road over Salmon CR in Lane County, Oregon. It was built in 1979, so it is 46 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5 vehicles a day, projected to reach 7 by 2045. The structure is 113 ft (34.4 m) long and 20 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesRoad
CrossesSalmon CR
Location3.1 NE JCT 58-FS 24-.2 SE
RouteFederal Lands Road 24002
StateOregon
Coordinates43.75739, -122.3839
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating77.1 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadOther
Structure length113 ft (34.4 m)
Longest span110 ft (33.5 m)
Deck width20 ft (6.1 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5 (2006)
Projected traffic7 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Road over Salmon CR built?

It was built in 1979, making it 46 years old in 2025.

What condition is Road over Salmon CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.

How much traffic does Road over Salmon CR carry?

About 5 vehicles per day (2006 count).

How long is Road over Salmon CR?

The structure is 113 ft (34.4 m) long with a longest span of 110 ft (33.5 m) and a deck 20 ft wide.

Who owns Road over Salmon CR?

It is owned by the U.S. Forest Service.