US Bridges

Or 58 (hwy 018) over Willamette R Relief Opng

FairPosted for load

Lane County, Oregon · 020 MI E HWY 1 JCT · Structure no. 05285A018 00196

Built
1955
70 years old, rebuilt 2009
Condition
Fair
inspected July 2023
Type
Tee Beam
Concrete
Length
123 ft
5 main spans
Daily traffic
12,291
2022 count
Owner
State
State Highway Agency

About this bridge

Or 58 (hwy 018) over Willamette R Relief Opng is a concrete tee beam carrying Or 58 (hwy 018) over Willamette R Relief Opng in Lane County, Oregon. It was built in 1955 and reconstructed in 2009, so it is 70 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.

It carries about 12,291 vehicles a day, roughly 12% of them trucks, projected to reach 16,700 by 2042. The structure is 123 ft (37.4 m) long and 41 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesOr 58 (hwy 018)
CrossesWillamette R Relief Opng
Location020 MI E HWY 1 JCT
RouteState Highway 58
StateOregon
Coordinates43.98436, -122.97525
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusPosted for other load-capacity restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating31.1 US tons
Inventory rating23.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length123 ft (37.4 m)
Longest span25 ft (7.6 m)
Deck width41 ft (12.4 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,291 (2022)
Projected traffic16,700 by 2042
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Or 58 (hwy 018) over Willamette R Relief Opng built?

It was built in 1955, making it 70 years old in 2025. It was reconstructed in 2009.

What condition is Or 58 (hwy 018) over Willamette R Relief Opng in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Or 58 (hwy 018) over Willamette R Relief Opng carry?

About 12,291 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Or 58 (hwy 018) over Willamette R Relief Opng?

The structure is 123 ft (37.4 m) long with a longest span of 25 ft (7.6 m) and a deck 41 ft wide.

Who owns Or 58 (hwy 018) over Willamette R Relief Opng?

It is owned by the State Highway Agency.