US Bridges

Cot Gr-Lorane RD over Silk Creek

Good

Lane County, Oregon · 039 MI W of HWY 99 · Structure no. 039C21260000394

Built
1993
32 years old
Condition
Good
inspected September 2024
Type
Slab
Prestressed Concrete
Length
71 ft
1 main span
Daily traffic
1,530
2020 count
Owner
County
County Highway Agency

About this bridge

Cot Gr-Lorane RD over Silk Creek is a prestressed concrete slab carrying Cot Gr-Lorane RD over Silk Creek in Lane County, Oregon. It was built in 1993, so it is 32 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,530 vehicles a day, roughly 10% of them trucks, projected to reach 1,750 by 2025. The structure is 71 ft (21.6 m) long and 32 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCot Gr-Lorane RD
CrossesSilk Creek
Location039 MI W of HWY 99
RouteCounty Highway A0468
StateOregon
Coordinates43.82217, -123.11859
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.8 US tons
Inventory rating44 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length71 ft (21.6 m)
Longest span70 ft (21.3 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,530 (2020)
Projected traffic1,750 by 2025
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cot Gr-Lorane RD over Silk Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is Cot Gr-Lorane RD over Silk Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Cot Gr-Lorane RD over Silk Creek carry?

About 1,530 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Cot Gr-Lorane RD over Silk Creek?

The structure is 71 ft (21.6 m) long with a longest span of 70 ft (21.3 m) and a deck 32 ft wide.

Who owns Cot Gr-Lorane RD over Silk Creek?

It is owned by the County Highway Agency.