US Bridges

Or 99E (hwy 58) over Slough

Good

Lane County, Oregon · 030 MI S Linn Lane CO LN · Structure no. 03944A058 03208

Built
1969
56 years old
Condition
Good
inspected December 2023
Type
Slab
Prestressed Concrete
Length
56 ft
2 main spans
Daily traffic
12,088
2022 count
Owner
State
State Highway Agency

About this bridge

Or 99E (hwy 58) over Slough is a prestressed concrete slab carrying Or 99E (hwy 58) over Slough in Lane County, Oregon. It was built in 1969, so it is 56 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,088 vehicles a day, roughly 19% of them trucks, projected to reach 12,200 by 2042. The structure is 56 ft (17.1 m) long and 44 ft wide. If it were closed, the detour would be 31.7 mi (51 km).

CarriesOr 99E (hwy 58)
CrossesSlough
Location030 MI S Linn Lane CO LN
RouteState Highway 99
StateOregon
Coordinates44.23285, -123.20051
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating51 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length56 ft (17.1 m)
Longest span28 ft (8.5 m)
Deck width44 ft (13.4 m)
Roadway width44 ft (13.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,088 (2022)
Projected traffic12,200 by 2042
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed31.7 mi (51 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Or 99E (hwy 58) over Slough built?

It was built in 1969, making it 56 years old in 2025.

What condition is Or 99E (hwy 58) over Slough in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Or 99E (hwy 58) over Slough carry?

About 12,088 vehicles per day (2022 count), of which roughly 19% are trucks.

How long is Or 99E (hwy 58) over Slough?

The structure is 56 ft (17.1 m) long with a longest span of 28 ft (8.5 m) and a deck 44 ft wide.

Who owns Or 99E (hwy 58) over Slough?

It is owned by the State Highway Agency.