US Bridges

16 S 08 W 35.01: over Greenleaf Creek

FairPosted for load

Lane County, Oregon · 2.9 Miles NW of HWY 36 (m · Structure no. 0000000L1439102

Built
1969
56 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
90 ft
3 main spans
Daily traffic
100
2024 count
Owner
Federal
Bureau of Land Management

About this bridge

16 S 08 W 35.01: over Greenleaf Creek is a concrete continuous stringer/multi-beam or girder carrying 16 S 08 W 35.01: over Greenleaf Creek in Lane County, Oregon. It was built in 1969, so it is 56 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 150 by 2044. The structure is 90 ft (27.4 m) long and 16 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

Carries16 S 08 W 35.01:
CrossesGreenleaf Creek
Location2.9 Miles NW of HWY 36 (m
RouteFederal Lands Road 0
StateOregon
Coordinates44.15833, -123.63639
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating32.5 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length90 ft (27.4 m)
Longest span60 ft (18.3 m)
Deck width16 ft (5 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2024)
Projected traffic150 by 2044
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Land Management
Maintained byBureau of Land Management
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 16 S 08 W 35.01: over Greenleaf Creek built?

It was built in 1969, making it 56 years old in 2025.

What condition is 16 S 08 W 35.01: over Greenleaf Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does 16 S 08 W 35.01: over Greenleaf Creek carry?

About 100 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is 16 S 08 W 35.01: over Greenleaf Creek?

The structure is 90 ft (27.4 m) long with a longest span of 60 ft (18.3 m) and a deck 16 ft wide.

Who owns 16 S 08 W 35.01: over Greenleaf Creek?

It is owned by the Bureau of Land Management.