US Bridges

No Data Entered over Sycan River

Good

Lake County, Oregon · No Data Entered · Structure no. 060203000025780

Built
2019
6 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
66 ft
1 main span
Daily traffic
85
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over Sycan River is a prestressed concrete stringer/multi-beam or girder carrying No Data Entered over Sycan River in Lake County, Oregon. It was built in 2019, so it is 6 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 85 vehicles a day, projected to reach 127 by 2045. The structure is 66 ft (20.1 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesNo Data Entered
CrossesSycan River
LocationNo Data Entered
RouteFederal Lands Road 28000
StateOregon
Coordinates42.66231, -120.79103
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating67.1 US tons
Inventory rating51.8 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length66 ft (20.1 m)
Longest span64 ft (19.5 m)
Deck width25 ft (7.6 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic85 (—)
Projected traffic127 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over Sycan River built?

It was built in 2019, making it 6 years old in 2025.

What condition is No Data Entered over Sycan River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does No Data Entered over Sycan River carry?

About 85 vehicles per day (latest count).

How long is No Data Entered over Sycan River?

The structure is 66 ft (20.1 m) long with a longest span of 64 ft (19.5 m) and a deck 25 ft wide.

Who owns No Data Entered over Sycan River?

It is owned by the U.S. Forest Service.