US Bridges

Anderson Ave over 1-C Drain Ditch

Good

Klamath County, Oregon · 0010 MI E of Altamont DR · Structure no. 35C366087400010

Built
1986
39 years old
Condition
Good
inspected March 2023
Type
Slab
Prestressed Concrete
Length
25 ft
1 main span
Daily traffic
1,361
2020 count
Owner
County
County Highway Agency

About this bridge

Anderson Ave over 1-C Drain Ditch is a prestressed concrete slab carrying Anderson Ave over 1-C Drain Ditch in Klamath County, Oregon. It was built in 1986, so it is 39 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,361 vehicles a day, roughly 20% of them trucks, projected to reach 1,436 by 2025. The structure is 25 ft (7.6 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesAnderson Ave
Crosses1-C Drain Ditch
Location0010 MI E of Altamont DR
RouteCounty Highway C0874
StateOregon
Coordinates42.1812, -121.7451
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82 US tons
Inventory rating48 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span24 ft (7.3 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,361 (2020)
Projected traffic1,436 by 2025
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Anderson Ave over 1-C Drain Ditch built?

It was built in 1986, making it 39 years old in 2025.

What condition is Anderson Ave over 1-C Drain Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Anderson Ave over 1-C Drain Ditch carry?

About 1,361 vehicles per day (2020 count), of which roughly 20% are trucks.

How long is Anderson Ave over 1-C Drain Ditch?

The structure is 25 ft (7.6 m) long with a longest span of 24 ft (7.3 m) and a deck 32 ft wide.

Who owns Anderson Ave over 1-C Drain Ditch?

It is owned by the County Highway Agency.