Or 140 (hwy 020) over Bikepath
GoodKlamath County, Oregon · 184 MI E Klamath Falls · Structure no. 21377 020 01839
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 82 ft
- 1 main span
- Daily traffic
- 2,921
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 140 (hwy 020) over Bikepath is a prestressed concrete stringer/multi-beam or girder carrying Or 140 (hwy 020) over Bikepath in Klamath County, Oregon. It was built in 2011, so it is 14 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,921 vehicles a day, roughly 17% of them trucks, projected to reach 3,100 by 2042. The structure is 82 ft (25.1 m) long and 39 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 140 (hwy 020) over Bikepath built?
It was built in 2011, making it 14 years old in 2025.
What condition is Or 140 (hwy 020) over Bikepath in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Or 140 (hwy 020) over Bikepath carry?
About 2,921 vehicles per day (2022 count), of which roughly 17% are trucks.
How long is Or 140 (hwy 020) over Bikepath?
The structure is 82 ft (25.1 m) long with a longest span of 82 ft (25.1 m) and a deck 39 ft wide.
Who owns Or 140 (hwy 020) over Bikepath?
It is owned by the State Highway Agency.