US Bridges

Elmer Nelson Way over Sand Creek

Fair

Josephine County, Oregon · South of Redwood Ave. and · Structure no. 22628 000 00000

Built
2016
9 years old
Condition
Fair
inspected October 2024
Type
Slab
Prestressed Concrete
Length
43 ft
1 main span
Daily traffic
150
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Elmer Nelson Way over Sand Creek is a prestressed concrete slab carrying Elmer Nelson Way over Sand Creek in Josephine County, Oregon. It was built in 2016, so it is 9 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 150 vehicles a day, roughly 1% of them trucks, projected to reach 175 by 2025. The structure is 43 ft (13 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesElmer Nelson Way
CrossesSand Creek
LocationSouth of Redwood Ave. and
RouteCity Street 0
StateOregon
Coordinates42.4187, -123.3856
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.5 US tons
Inventory rating45.3 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length43 ft (13 m)
Longest span40 ft (12.2 m)
Deck width44 ft (13.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2020)
Projected traffic175 by 2025
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Elmer Nelson Way over Sand Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is Elmer Nelson Way over Sand Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Elmer Nelson Way over Sand Creek carry?

About 150 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Elmer Nelson Way over Sand Creek?

The structure is 43 ft (13 m) long with a longest span of 40 ft (12.2 m) and a deck 44 ft wide.

Who owns Elmer Nelson Way over Sand Creek?

It is owned by the City or Municipal Highway Agency.