US 199 (hwy 025) over Applegate River
GoodJosephine County, Oregon · 6.97 MI W of Grants Pass · Structure no. 21343 025 00697
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 520 ft
- 3 main spans
- Daily traffic
- 10,962
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 199 (hwy 025) over Applegate River is a prestressed concrete continuous stringer/multi-beam or girder carrying US 199 (hwy 025) over Applegate River in Josephine County, Oregon. It was built in 2012, so it is 13 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,962 vehicles a day, roughly 2% of them trucks, projected to reach 14,600 by 2042. The structure is 520 ft (158.5 m) long and 47 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 199 (hwy 025) over Applegate River built?
It was built in 2012, making it 13 years old in 2025.
What condition is US 199 (hwy 025) over Applegate River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does US 199 (hwy 025) over Applegate River carry?
About 10,962 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is US 199 (hwy 025) over Applegate River?
The structure is 520 ft (158.5 m) long with a longest span of 180 ft (54.9 m) and a deck 47 ft wide.
Who owns US 199 (hwy 025) over Applegate River?
It is owned by the State Highway Agency.