US Bridges

32 S 05 W 35.01: over Quines Creek

Good

Josephine County, Oregon · 3.7 Miles SE of I-5 (exit · Structure no. 0000000L1412233

Built
2006
19 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
15
2023 count
Owner
Federal
Bureau of Land Management

About this bridge

32 S 05 W 35.01: over Quines Creek is a prestressed concrete stringer/multi-beam or girder carrying 32 S 05 W 35.01: over Quines Creek in Josephine County, Oregon. It was built in 2006, so it is 19 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15 vehicles a day, roughly 1% of them trucks, projected to reach 20 by 2043. The structure is 61 ft (18.7 m) long and 20 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

Carries32 S 05 W 35.01:
CrossesQuines Creek
Location3.7 Miles SE of I-5 (exit
RouteFederal Lands Road 0
StateOregon
Coordinates42.7393, -123.26072
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating107.1 US tons
Inventory rating69.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length61 ft (18.7 m)
Longest span59 ft (18 m)
Deck width20 ft (6.1 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2023)
Projected traffic20 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Land Management
Maintained byBureau of Land Management
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 32 S 05 W 35.01: over Quines Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is 32 S 05 W 35.01: over Quines Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does 32 S 05 W 35.01: over Quines Creek carry?

About 15 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is 32 S 05 W 35.01: over Quines Creek?

The structure is 61 ft (18.7 m) long with a longest span of 59 ft (18 m) and a deck 20 ft wide.

Who owns 32 S 05 W 35.01: over Quines Creek?

It is owned by the Bureau of Land Management.