US Bridges

No Data Entered over First Creek

Good

Jefferson County, Oregon · No Data Entered · Structure no. 060105000001049

Built
2004
21 years old
Condition
Good
inspected November 2024
Type
Culvert
Steel
Length
22 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over First Creek is a steel culvert carrying No Data Entered over First Creek in Jefferson County, Oregon. It was built in 2004, so it is 21 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 98.2 mi (158 km).

CarriesNo Data Entered
CrossesFirst Creek
LocationNo Data Entered
RouteFederal Lands Road 1210
StateOregon
Coordinates44.45201, -121.7255
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating28.5 US tons
Inventory rating22.2 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans1
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span22 ft (6.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over First Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is No Data Entered over First Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does No Data Entered over First Creek carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over First Creek?

The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m).

Who owns No Data Entered over First Creek?

It is owned by the U.S. Forest Service.