Or 99 (hwy 060) over Birdseye Creek
FairJackson County, Oregon · 05.3 E Jack.-Jose. CO LN · Structure no. 24004 060 01083
- Built
- 2024
- 1 years old
- Condition
- Fair
- inspected November 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 86 ft
- 1 main span
- Daily traffic
- 2,246
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 99 (hwy 060) over Birdseye Creek is a prestressed concrete slab carrying Or 99 (hwy 060) over Birdseye Creek in Jackson County, Oregon. It was built in 2024, so it is 1 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,246 vehicles a day, roughly 9% of them trucks, projected to reach 2,400 by 2042. The structure is 86 ft (26.2 m) long and 44 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 99 (hwy 060) over Birdseye Creek built?
It was built in 2024, making it 1 years old in 2025.
What condition is Or 99 (hwy 060) over Birdseye Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Or 99 (hwy 060) over Birdseye Creek carry?
About 2,246 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is Or 99 (hwy 060) over Birdseye Creek?
The structure is 86 ft (26.2 m) long with a longest span of 86 ft (26.2 m) and a deck 44 ft wide.
Who owns Or 99 (hwy 060) over Birdseye Creek?
It is owned by the State Highway Agency.