US Bridges

Haskell Street over Griffin Creek

Good

Jackson County, Oregon · Haskell Street · Structure no. 23831 000 00000

Built
2018
7 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
87 ft
1 main span
Daily traffic
220
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Haskell Street over Griffin Creek is a prestressed concrete box beam or girders - multiple carrying Haskell Street over Griffin Creek in Jackson County, Oregon. It was built in 2018, so it is 7 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 220 vehicles a day, projected to reach 230 by 2025. The structure is 87 ft (26.6 m) long and 52 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesHaskell Street
CrossesGriffin Creek
LocationHaskell Street
RouteCity Street 0
StateOregon
Coordinates42.37704, -122.92448
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.9 US tons
Inventory rating76.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length87 ft (26.6 m)
Longest span87 ft (26.6 m)
Deck width52 ft (15.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2020)
Projected traffic230 by 2025
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Haskell Street over Griffin Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Haskell Street over Griffin Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Haskell Street over Griffin Creek carry?

About 220 vehicles per day (2020 count).

How long is Haskell Street over Griffin Creek?

The structure is 87 ft (26.6 m) long with a longest span of 87 ft (26.6 m) and a deck 52 ft wide.

Who owns Haskell Street over Griffin Creek?

It is owned by the City or Municipal Highway Agency.