City Street 19T15 over Barnett Road at Bear CR
FairJackson County, Oregon · Barnett Road at Bear CR · Structure no. 19285 015 00115
- Built
- 2009
- 16 years old
- Condition
- Fair
- inspected July 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 171 ft
- 1 main span
- Daily traffic
- 31,423
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
City Street 19T15 over Barnett Road at Bear CR is a prestressed concrete tee beam carrying City Street 19T15 over Barnett Road at Bear CR in Jackson County, Oregon. It was built in 2009, so it is 16 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 31,423 vehicles a day, roughly 10% of them trucks, projected to reach 54,297 by 2025. The structure is 171 ft (52 m) long and 100 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was City Street 19T15 over Barnett Road at Bear CR built?
It was built in 2009, making it 16 years old in 2025.
What condition is City Street 19T15 over Barnett Road at Bear CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does City Street 19T15 over Barnett Road at Bear CR carry?
About 31,423 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is City Street 19T15 over Barnett Road at Bear CR?
The structure is 171 ft (52 m) long with a longest span of 171 ft (52 m) and a deck 100 ft wide.
Who owns City Street 19T15 over Barnett Road at Bear CR?
It is owned by the City or Municipal Highway Agency.