City Street 19T3 over 8th Street @ Bear Creek
FairJackson County, Oregon · Eighth ST at Bear Creek · Structure no. 08607 003 00005
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 182 ft
- 3 main spans
- Daily traffic
- 10,030
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
City Street 19T3 over 8th Street @ Bear Creek is a concrete continuous stringer/multi-beam or girder carrying City Street 19T3 over 8th Street @ Bear Creek in Jackson County, Oregon. It was built in 1959, so it is 66 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,030 vehicles a day, roughly 10% of them trucks, projected to reach 15,478 by 2025. The structure is 182 ft (55.5 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was City Street 19T3 over 8th Street @ Bear Creek built?
It was built in 1959, making it 66 years old in 2025.
What condition is City Street 19T3 over 8th Street @ Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does City Street 19T3 over 8th Street @ Bear Creek carry?
About 10,030 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is City Street 19T3 over 8th Street @ Bear Creek?
The structure is 182 ft (55.5 m) long with a longest span of 70 ft (21.3 m) and a deck 38 ft wide.
Who owns City Street 19T3 over 8th Street @ Bear Creek?
It is owned by the City or Municipal Highway Agency.