Or 99 (hwy 271) over Sardine Creek
GoodJackson County, Oregon · 01.1 MI S HWY 060 JCT · Structure no. 01937 271 00080
- Built
- 1938
- 87 years old
- Condition
- Good
- inspected August 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 130 ft
- 3 main spans
- Daily traffic
- 2,931
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 99 (hwy 271) over Sardine Creek is a concrete continuous tee beam carrying Or 99 (hwy 271) over Sardine Creek in Jackson County, Oregon. It was built in 1938, so it is 87 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,931 vehicles a day, roughly 11% of them trucks, projected to reach 3,000 by 2042. The structure is 130 ft (39.6 m) long and 35 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 99 (hwy 271) over Sardine Creek built?
It was built in 1938, making it 87 years old in 2025.
What condition is Or 99 (hwy 271) over Sardine Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Or 99 (hwy 271) over Sardine Creek carry?
About 2,931 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is Or 99 (hwy 271) over Sardine Creek?
The structure is 130 ft (39.6 m) long with a longest span of 50 ft (15.2 m) and a deck 35 ft wide.
Who owns Or 99 (hwy 271) over Sardine Creek?
It is owned by the State Highway Agency.