US Bridges

35 S 03 W 07.00: over Evans Creek

Good

Jackson County, Oregon · 0.1 Miles SE of East Evan · Structure no. 0000000L2129627

Built
2021
4 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
135 ft
1 main span
Daily traffic
100
2023 count
Owner
Federal
Bureau of Land Management

About this bridge

35 S 03 W 07.00: over Evans Creek is a concrete stringer/multi-beam or girder carrying 35 S 03 W 07.00: over Evans Creek in Jackson County, Oregon. It was built in 2021, so it is 4 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 150 by 2043. The structure is 135 ft (41.1 m) long and 18 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

Carries35 S 03 W 07.00:
CrossesEvans Creek
Location0.1 Miles SE of East Evan
RouteFederal Lands Road 0
StateOregon
Coordinates42.54772, -123.09747
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.7 US tons
Inventory rating35.4 US tons

Structure

MaterialConcrete
DeckOther
Main spans1
Design loadHL 93
Structure length135 ft (41.1 m)
Longest span132 ft (40.1 m)
Deck width18 ft (5.5 m)
Roadway width15 ft (4.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic150 by 2043
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Land Management
Maintained byBureau of Land Management
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 35 S 03 W 07.00: over Evans Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is 35 S 03 W 07.00: over Evans Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does 35 S 03 W 07.00: over Evans Creek carry?

About 100 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is 35 S 03 W 07.00: over Evans Creek?

The structure is 135 ft (41.1 m) long with a longest span of 132 ft (40.1 m) and a deck 18 ft wide.

Who owns 35 S 03 W 07.00: over Evans Creek?

It is owned by the Bureau of Land Management.