US Bridges

34 S 03 W 24.00: over West Fork Evans Creek

Good

Jackson County, Oregon · 13.6 Miles NW of East Eva · Structure no. 0000000L1824555

Built
2003
22 years old
Condition
Good
inspected April 2023
Type
Slab
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
25
2023 count
Owner
Federal
Bureau of Land Management

About this bridge

34 S 03 W 24.00: over West Fork Evans Creek is a prestressed concrete slab carrying 34 S 03 W 24.00: over West Fork Evans Creek in Jackson County, Oregon. It was built in 2003, so it is 22 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 40 by 2043. The structure is 75 ft (22.9 m) long and 20 ft wide. If it were closed, the detour would be 19.3 mi (31 km).

Carries34 S 03 W 24.00:
CrossesWest Fork Evans Creek
Location13.6 Miles NW of East Eva
RouteFederal Lands Road 0
StateOregon
Coordinates42.72278, -123.10667
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating78.3 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length75 ft (22.9 m)
Longest span73 ft (22.3 m)
Deck width20 ft (6.1 m)
Roadway width17 ft (5.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2023)
Projected traffic40 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Land Management
Maintained byBureau of Land Management
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$4,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 34 S 03 W 24.00: over West Fork Evans Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is 34 S 03 W 24.00: over West Fork Evans Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does 34 S 03 W 24.00: over West Fork Evans Creek carry?

About 25 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is 34 S 03 W 24.00: over West Fork Evans Creek?

The structure is 75 ft (22.9 m) long with a longest span of 73 ft (22.3 m) and a deck 20 ft wide.

Who owns 34 S 03 W 24.00: over West Fork Evans Creek?

It is owned by the Bureau of Land Management.