Frontage RD HWY 2 over UPRR
FairHood River County, Oregon · In Hood River · Structure no. 07458 002F06398
- Built
- 1952
- 73 years old, rebuilt 1997
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 261 ft
- 5 main spans
- Daily traffic
- 32,987
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Frontage RD HWY 2 over UPRR is a concrete continuous stringer/multi-beam or girder carrying Frontage RD HWY 2 over UPRR in Hood River County, Oregon. It was built in 1952 and reconstructed in 1997, so it is 73 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,987 vehicles a day, roughly 20% of them trucks, projected to reach 39,600 by 2042. The structure is 261 ft (79.6 m) long and 54 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Frontage RD HWY 2 over UPRR built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1997.
What condition is Frontage RD HWY 2 over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Frontage RD HWY 2 over UPRR carry?
About 32,987 vehicles per day (2022 count), of which roughly 20% are trucks.
How long is Frontage RD HWY 2 over UPRR?
The structure is 261 ft (79.6 m) long with a longest span of 70 ft (21.3 m) and a deck 54 ft wide.
Who owns Frontage RD HWY 2 over UPRR?
It is owned by the State Highway Agency.