US Bridges

No Data Entered over Mcgee Creek

Good

Hood River County, Oregon · S1 T2S R8E · Structure no. 060606000014694

Built
2015
10 years old
Condition
Good
inspected June 2022
Type
Slab
Prestressed Concrete
Length
71 ft
1 main span
Daily traffic
50
2015 count
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over Mcgee Creek is a prestressed concrete slab carrying No Data Entered over Mcgee Creek in Hood River County, Oregon. It was built in 2015, so it is 10 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 71 ft (21.6 m) long and 20 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesNo Data Entered
CrossesMcgee Creek
LocationS1 T2S R8E
RouteFederal Lands Road 18000
StateOregon
Coordinates45.41822, -121.76853
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating64.3 US tons
Inventory rating48.6 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length71 ft (21.6 m)
Longest span70 ft (21.3 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2015)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over Mcgee Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is No Data Entered over Mcgee Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does No Data Entered over Mcgee Creek carry?

About 50 vehicles per day (2015 count).

How long is No Data Entered over Mcgee Creek?

The structure is 71 ft (21.6 m) long with a longest span of 70 ft (21.3 m) and a deck 20 ft wide.

Who owns No Data Entered over Mcgee Creek?

It is owned by the U.S. Forest Service.