US Bridges

Or 205 (hwy 440) over Silvies River

Good

Harney County, Oregon · 1.0 Mi. S. Jct. Ore 78 · Structure no. 17456 440 00098

Built
1997
28 years old
Condition
Good
inspected October 2023
Type
Slab
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
420
2022 count
Owner
State
State Highway Agency

About this bridge

Or 205 (hwy 440) over Silvies River is a prestressed concrete slab carrying Or 205 (hwy 440) over Silvies River in Harney County, Oregon. It was built in 1997, so it is 28 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 420 vehicles a day, roughly 34% of them trucks, projected to reach 430 by 2042. The structure is 40 ft (12.3 m) long and 32 ft wide. If it were closed, the detour would be 33.6 mi (54 km).

CarriesOr 205 (hwy 440)
CrossesSilvies River
Location1.0 Mi. S. Jct. Ore 78
RouteState Highway 205
StateOregon
Coordinates43.57166, -119.02013
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.9 US tons
Inventory rating32.8 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length40 ft (12.3 m)
Longest span39 ft (12 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic420 (2022)
Projected traffic430 by 2042
Trucks34%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed33.6 mi (54 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Or 205 (hwy 440) over Silvies River built?

It was built in 1997, making it 28 years old in 2025.

What condition is Or 205 (hwy 440) over Silvies River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Or 205 (hwy 440) over Silvies River carry?

About 420 vehicles per day (2022 count), of which roughly 34% are trucks.

How long is Or 205 (hwy 440) over Silvies River?

The structure is 40 ft (12.3 m) long with a longest span of 39 ft (12 m) and a deck 32 ft wide.

Who owns Or 205 (hwy 440) over Silvies River?

It is owned by the State Highway Agency.