Patrol Road over Center Canal
FairPosted for loadHarney County, Oregon · 17.2 MI S of Hdqtrs · Structure no. 000013570-00212
- Built
- 1940
- 85 years old, rebuilt 1993
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 26 ft
- 1 main span
- Daily traffic
- 1
- 2024 count
- Owner
- Federal
- Bureau of Fish and Wildlife
About this bridge
Patrol Road over Center Canal is a steel stringer/multi-beam or girder carrying Patrol Road over Center Canal in Harney County, Oregon. It was built in 1940 and reconstructed in 1993, so it is 85 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1 vehicles a day, projected to reach 1 by 2044. The structure is 26 ft (7.9 m) long and 14 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Patrol Road over Center Canal built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1993.
What condition is Patrol Road over Center Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Patrol Road over Center Canal carry?
About 1 vehicles per day (2024 count).
How long is Patrol Road over Center Canal?
The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 14 ft wide.
Who owns Patrol Road over Center Canal?
It is owned by the Bureau of Fish and Wildlife.