County RD 1 over N Fk John Day R(rudio Br
FairGrant County, Oregon · 0.1 MI S JCT State 402 · Structure no. 23C011001 00010
- Built
- 1966
- 59 years old
- Condition
- Fair
- inspected July 2023
- Type
- Truss - Thru
- Steel
- Length
- 354 ft
- 1 main span
- Daily traffic
- 16
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 1 over N Fk John Day R(rudio Br is a steel truss - thru carrying County RD 1 over N Fk John Day R(rudio Br in Grant County, Oregon. It was built in 1966, so it is 59 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16 vehicles a day, roughly 10% of them trucks, projected to reach 19 by 2025. The structure is 354 ft (107.9 m) long and 22 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 1 over N Fk John Day R(rudio Br built?
It was built in 1966, making it 59 years old in 2025.
What condition is County RD 1 over N Fk John Day R(rudio Br in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does County RD 1 over N Fk John Day R(rudio Br carry?
About 16 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is County RD 1 over N Fk John Day R(rudio Br?
The structure is 354 ft (107.9 m) long with a longest span of 151 ft (46 m) and a deck 22 ft wide.
Who owns County RD 1 over N Fk John Day R(rudio Br?
It is owned by the County Highway Agency.