Phillipi Canyon RD over I-84 (hwy 002)
GoodGilliam County, Oregon · 088 MI E Sherman Gill Cln · Structure no. 08944 002C12331
- Built
- 1964
- 61 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 188 ft
- 3 main spans
- Daily traffic
- 20
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Phillipi Canyon RD over I-84 (hwy 002) is a prestressed concrete stringer/multi-beam or girder carrying Phillipi Canyon RD over I-84 (hwy 002) in Gilliam County, Oregon. It was built in 1964, so it is 61 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 35% of them trucks, projected to reach 48 by 2030. The structure is 188 ft (57.3 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Phillipi Canyon RD over I-84 (hwy 002) built?
It was built in 1964, making it 61 years old in 2025.
What condition is Phillipi Canyon RD over I-84 (hwy 002) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Phillipi Canyon RD over I-84 (hwy 002) carry?
About 20 vehicles per day (2022 count), of which roughly 35% are trucks.
How long is Phillipi Canyon RD over I-84 (hwy 002)?
The structure is 188 ft (57.3 m) long with a longest span of 82 ft (25 m) and a deck 31 ft wide.
Who owns Phillipi Canyon RD over I-84 (hwy 002)?
It is owned by the State Highway Agency.