I-84 (hwy 002) WB over Willow Creek West
FairGilliam County, Oregon · 011 MI E Heppner JCT · Structure no. 07520A002 14860
- Built
- 1954
- 71 years old, rebuilt 1966
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 292 ft
- 3 main spans
- Daily traffic
- 7,076
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-84 (hwy 002) WB over Willow Creek West is a prestressed concrete stringer/multi-beam or girder carrying I-84 (hwy 002) WB over Willow Creek West in Gilliam County, Oregon. It was built in 1954 and reconstructed in 1966, so it is 71 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,076 vehicles a day, roughly 26% of them trucks, projected to reach 9,200 by 2042. The structure is 292 ft (89 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-84 (hwy 002) WB over Willow Creek West built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1966.
What condition is I-84 (hwy 002) WB over Willow Creek West in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I-84 (hwy 002) WB over Willow Creek West carry?
About 7,076 vehicles per day (2022 count), of which roughly 26% are trucks.
How long is I-84 (hwy 002) WB over Willow Creek West?
The structure is 292 ft (89 m) long with a longest span of 98 ft (29.9 m) and a deck 34 ft wide.
Who owns I-84 (hwy 002) WB over Willow Creek West?
It is owned by the State Highway Agency.