Stewart Parkway over South Umpqua River
FairDouglas County, Oregon · 0.9 MI W of I-5 · Structure no. 26T09 000 00000
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 636 ft
- 3 main spans
- Daily traffic
- 12,589
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stewart Parkway over South Umpqua River is a prestressed concrete continuous stringer/multi-beam or girder carrying Stewart Parkway over South Umpqua River in Douglas County, Oregon. It was built in 1978, so it is 47 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,589 vehicles a day, roughly 10% of them trucks, projected to reach 13,339 by 2025. The structure is 636 ft (193.9 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stewart Parkway over South Umpqua River built?
It was built in 1978, making it 47 years old in 2025.
What condition is Stewart Parkway over South Umpqua River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Stewart Parkway over South Umpqua River carry?
About 12,589 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Stewart Parkway over South Umpqua River?
The structure is 636 ft (193.9 m) long with a longest span of 260 ft (79.2 m) and a deck 48 ft wide.
Who owns Stewart Parkway over South Umpqua River?
It is owned by the City or Municipal Highway Agency.