US Bridges

I-5 (hwy 001) SB over I-5 @ Corp

Fair

Douglas County, Oregon · 4.3 MI S of Sutherlin Scl · Structure no. 20212 001 13046

Built
2007
18 years old
Condition
Fair
inspected February 2023
Type
Slab
Prestressed Concrete Continuous
Length
141 ft
2 main spans
Daily traffic
16,874
2022 count
Owner
State
State Highway Agency

About this bridge

I-5 (hwy 001) SB over I-5 @ Corp is a prestressed concrete continuous slab carrying I-5 (hwy 001) SB over I-5 @ Corp in Douglas County, Oregon. It was built in 2007, so it is 18 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,874 vehicles a day, roughly 20% of them trucks, projected to reach 17,600 by 2042. The structure is 141 ft (43.1 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-5 (hwy 001) SB
CrossesI-5 @ Corp
Location4.3 MI S of Sutherlin Scl
RouteInterstate 5
StateOregon
Coordinates43.30344, -123.34939
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30.8 US tons
Inventory rating23.6 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length141 ft (43.1 m)
Longest span78 ft (23.9 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,874 (2022)
Projected traffic17,600 by 2042
Trucks20%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-5 (hwy 001) SB over I-5 @ Corp built?

It was built in 2007, making it 18 years old in 2025.

What condition is I-5 (hwy 001) SB over I-5 @ Corp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does I-5 (hwy 001) SB over I-5 @ Corp carry?

About 16,874 vehicles per day (2022 count), of which roughly 20% are trucks.

How long is I-5 (hwy 001) SB over I-5 @ Corp?

The structure is 141 ft (43.1 m) long with a longest span of 78 ft (23.9 m) and a deck 45 ft wide.

Who owns I-5 (hwy 001) SB over I-5 @ Corp?

It is owned by the State Highway Agency.