Dawson RD over Deer Creek
FairPosted for loadDouglas County, Oregon · 1.5 MI E of Roseburg · Structure no. 19C149014800001
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 101 ft
- 3 main spans
- Daily traffic
- 88
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Dawson RD over Deer Creek is a prestressed concrete slab carrying Dawson RD over Deer Creek in Douglas County, Oregon. It was built in 1984, so it is 41 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 88 vehicles a day, projected to reach 98 by 2025. The structure is 101 ft (30.8 m) long and 16 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dawson RD over Deer Creek built?
It was built in 1984, making it 41 years old in 2025.
What condition is Dawson RD over Deer Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Dawson RD over Deer Creek carry?
About 88 vehicles per day (2020 count).
How long is Dawson RD over Deer Creek?
The structure is 101 ft (30.8 m) long with a longest span of 40 ft (12.2 m) and a deck 16 ft wide.
Who owns Dawson RD over Deer Creek?
It is owned by the County Highway Agency.