Waite Ave over Sutherlin Creek
FairDouglas County, Oregon · In Sutherlin · Structure no. 19B07A000000000
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 592
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Waite Ave over Sutherlin Creek is a prestressed concrete slab carrying Waite Ave over Sutherlin Creek in Douglas County, Oregon. It was built in 1990, so it is 35 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 592 vehicles a day, roughly 10% of them trucks, projected to reach 672 by 2025. The structure is 50 ft (15.2 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Waite Ave over Sutherlin Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Waite Ave over Sutherlin Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Waite Ave over Sutherlin Creek carry?
About 592 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Waite Ave over Sutherlin Creek?
The structure is 50 ft (15.2 m) long with a longest span of 49 ft (14.9 m) and a deck 28 ft wide.
Who owns Waite Ave over Sutherlin Creek?
It is owned by the City or Municipal Highway Agency.