County RD 50 over Bachellor Creek
FairDouglas County, Oregon · 4.8 MI E of Oakland · Structure no. 18903 050 00084
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 94 ft
- 1 main span
- Daily traffic
- 571
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 50 over Bachellor Creek is a prestressed concrete stringer/multi-beam or girder carrying County RD 50 over Bachellor Creek in Douglas County, Oregon. It was built in 2002, so it is 23 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 571 vehicles a day, roughly 7% of them trucks, projected to reach 646 by 2025. The structure is 94 ft (28.7 m) long and 34 ft wide. If it were closed, the detour would be 4.3 mi (7 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 50 over Bachellor Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is County RD 50 over Bachellor Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does County RD 50 over Bachellor Creek carry?
About 571 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is County RD 50 over Bachellor Creek?
The structure is 94 ft (28.7 m) long with a longest span of 93 ft (28.3 m) and a deck 34 ft wide.
Who owns County RD 50 over Bachellor Creek?
It is owned by the County Highway Agency.