US Bridges

22 S 09 W 07.00: over Vincent Creek

Fair

Douglas County, Oregon · 8 Miles N of HWY 38 (mp 1 · Structure no. 0000000L1439057

Built
1966
59 years old
Condition
Fair
inspected March 2023
Type
Tee Beam
Concrete Continuous
Length
70 ft
3 main spans
Daily traffic
50
2023 count
Owner
Federal
Bureau of Land Management

About this bridge

22 S 09 W 07.00: over Vincent Creek is a concrete continuous tee beam carrying 22 S 09 W 07.00: over Vincent Creek in Douglas County, Oregon. It was built in 1966, so it is 59 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 75 by 2043. The structure is 70 ft (21.3 m) long and 16 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

Carries22 S 09 W 07.00:
CrossesVincent Creek
Location8 Miles N of HWY 38 (mp 1
RouteFederal Lands Road 0
StateOregon
Coordinates43.72722, -123.74806
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating85.3 US tons
Inventory rating51 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length70 ft (21.3 m)
Longest span45 ft (13.7 m)
Deck width16 ft (5 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic75 by 2043
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Land Management
Maintained byBureau of Land Management
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost$3,000 (2021 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 22 S 09 W 07.00: over Vincent Creek built?

It was built in 1966, making it 59 years old in 2025.

What condition is 22 S 09 W 07.00: over Vincent Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does 22 S 09 W 07.00: over Vincent Creek carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is 22 S 09 W 07.00: over Vincent Creek?

The structure is 70 ft (21.3 m) long with a longest span of 45 ft (13.7 m) and a deck 16 ft wide.

Who owns 22 S 09 W 07.00: over Vincent Creek?

It is owned by the Bureau of Land Management.