US Bridges

U Xing 3rd ST Br over US 97 (hwy 004)

Good

Deschutes County, Oregon · MP 140.84 HWY 004 · Structure no. 22019 004 14087

Built
2014
11 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
140 ft
1 main span
Daily traffic
4,593
2022 count
Owner
State
State Highway Agency

About this bridge

U Xing 3rd ST Br over US 97 (hwy 004) is a prestressed concrete continuous stringer/multi-beam or girder carrying U Xing 3rd ST Br over US 97 (hwy 004) in Deschutes County, Oregon. It was built in 2014, so it is 11 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,593 vehicles a day, roughly 6% of them trucks, projected to reach 25,200 by 2036. The structure is 140 ft (42.7 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesU Xing 3rd ST Br
CrossesUS 97 (hwy 004)
LocationMP 140.84 HWY 004
RouteU.S. Route 97
StateOregon
Coordinates44.01663, -121.31915
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38.3 US tons
Inventory rating29.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length140 ft (42.7 m)
Longest span70 ft (21.3 m)
Deck width31 ft (9.6 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,593 (2022)
Projected traffic25,200 by 2036
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was U Xing 3rd ST Br over US 97 (hwy 004) built?

It was built in 2014, making it 11 years old in 2025.

What condition is U Xing 3rd ST Br over US 97 (hwy 004) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does U Xing 3rd ST Br over US 97 (hwy 004) carry?

About 4,593 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is U Xing 3rd ST Br over US 97 (hwy 004)?

The structure is 140 ft (42.7 m) long with a longest span of 70 ft (21.3 m) and a deck 31 ft wide.

Who owns U Xing 3rd ST Br over US 97 (hwy 004)?

It is owned by the State Highway Agency.