US Bridges

Reed Market RD over Deschutes River

Fair

Deschutes County, Oregon · On Reed Market RD · Structure no. 20669 000 00000

Built
2005
20 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
481 ft
3 main spans
Daily traffic
5,683
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Reed Market RD over Deschutes River is a steel continuous stringer/multi-beam or girder carrying Reed Market RD over Deschutes River in Deschutes County, Oregon. It was built in 2005, so it is 20 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,683 vehicles a day, roughly 5% of them trucks, projected to reach 6,298 by 2025. The structure is 481 ft (146.6 m) long and 56 ft wide.

CarriesReed Market RD
CrossesDeschutes River
LocationOn Reed Market RD
RouteCity Street C0000
StateOregon
Coordinates44.04037, -121.32999
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating87.5 US tons
Inventory rating67.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length481 ft (146.6 m)
Longest span215 ft (65.5 m)
Deck width56 ft (17.1 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,683 (2020)
Projected traffic6,298 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Reed Market RD over Deschutes River built?

It was built in 2005, making it 20 years old in 2025.

What condition is Reed Market RD over Deschutes River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Reed Market RD over Deschutes River carry?

About 5,683 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Reed Market RD over Deschutes River?

The structure is 481 ft (146.6 m) long with a longest span of 215 ft (65.5 m) and a deck 56 ft wide.

Who owns Reed Market RD over Deschutes River?

It is owned by the City or Municipal Highway Agency.