Weigan RD CO RD211 over Irrigation Ditch Weigand
GoodCrook County, Oregon · 01.6 MI S HWY No 41 · Structure no. 24010 211 00160
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected December 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 156
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Weigan RD CO RD211 over Irrigation Ditch Weigand is a prestressed concrete slab carrying Weigan RD CO RD211 over Irrigation Ditch Weigand in Crook County, Oregon. It was built in 2023, so it is 2 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 156 vehicles a day, roughly 5% of them trucks, projected to reach 186 by 2025. The structure is 33 ft (10.1 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Weigan RD CO RD211 over Irrigation Ditch Weigand built?
It was built in 2023, making it 2 years old in 2025.
What condition is Weigan RD CO RD211 over Irrigation Ditch Weigand in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does Weigan RD CO RD211 over Irrigation Ditch Weigand carry?
About 156 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is Weigan RD CO RD211 over Irrigation Ditch Weigand?
The structure is 33 ft (10.1 m) long with a longest span of 31 ft (9.4 m) and a deck 28 ft wide.
Who owns Weigan RD CO RD211 over Irrigation Ditch Weigand?
It is owned by the County Highway Agency.