US Bridges

Forest RD 2200-000 over Ochoco Creek

Good

Crook County, Oregon · .1MI UP RD22 FR 22 42 JCT · Structure no. 060701000001015

Built
1975
50 years old, rebuilt 1995
Condition
Good
inspected November 2021
Type
Slab
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
125
1993 count
Owner
Federal
U.S. Forest Service

About this bridge

Forest RD 2200-000 over Ochoco Creek is a prestressed concrete slab carrying Forest RD 2200-000 over Ochoco Creek in Crook County, Oregon. It was built in 1975 and reconstructed in 1995, so it is 50 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 125 vehicles a day, roughly 20% of them trucks, projected to reach 187 by 2045. The structure is 42 ft (12.9 m) long and 33 ft wide.

CarriesForest RD 2200-000
CrossesOchoco Creek
Location.1MI UP RD22 FR 22 42 JCT
RouteFederal Lands Road 2200
StateOregon
Coordinates44.39626, -120.4174
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating40 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadH 20
Structure length42 ft (12.9 m)
Longest span41 ft (12.5 m)
Deck width33 ft (10 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (1993)
Projected traffic187 by 2045
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Forest RD 2200-000 over Ochoco Creek built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1995.

What condition is Forest RD 2200-000 over Ochoco Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.

How much traffic does Forest RD 2200-000 over Ochoco Creek carry?

About 125 vehicles per day (1993 count), of which roughly 20% are trucks.

How long is Forest RD 2200-000 over Ochoco Creek?

The structure is 42 ft (12.9 m) long with a longest span of 41 ft (12.5 m) and a deck 33 ft wide.

Who owns Forest RD 2200-000 over Ochoco Creek?

It is owned by the U.S. Forest Service.