US Bridges

Templeton Road over Robertson Creek

Fair

Coos County, Oregon · Near Templeton · Structure no. 20637 363500075

Built
2006
19 years old
Condition
Fair
inspected September 2024
Type
Slab
Prestressed Concrete
Length
32 ft
1 main span
Daily traffic
203
2020 count
Owner
County
County Highway Agency

About this bridge

Templeton Road over Robertson Creek is a prestressed concrete slab carrying Templeton Road over Robertson Creek in Coos County, Oregon. It was built in 2006, so it is 19 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 203 vehicles a day, roughly 10% of them trucks, projected to reach 232 by 2025. The structure is 32 ft (9.8 m) long and 20 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesTempleton Road
CrossesRobertson Creek
LocationNear Templeton
RouteCounty Highway C0000
StateOregon
Coordinates43.5432, -124.10216
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment6: Equal to present minimum criteria
Operating rating43.2 US tons
Inventory rating33.2 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadUnknown
Structure length32 ft (9.8 m)
Longest span32 ft (9.8 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic203 (2020)
Projected traffic232 by 2025
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Templeton Road over Robertson Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is Templeton Road over Robertson Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Templeton Road over Robertson Creek carry?

About 203 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is Templeton Road over Robertson Creek?

The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m) and a deck 20 ft wide.

Who owns Templeton Road over Robertson Creek?

It is owned by the County Highway Agency.