County RD 19 over Catching Creek
FairPosted for loadCoos County, Oregon · 480 from JCT RD 19 an 20 · Structure no. 11C152001900480
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected September 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 77 ft
- 1 main span
- Daily traffic
- 240
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 19 over Catching Creek is a prestressed concrete tee beam carrying County RD 19 over Catching Creek in Coos County, Oregon. It was built in 1970, so it is 55 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 240 vehicles a day, roughly 5% of them trucks, projected to reach 270 by 2025. The structure is 77 ft (23.5 m) long and 24 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 19 over Catching Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is County RD 19 over Catching Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does County RD 19 over Catching Creek carry?
About 240 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is County RD 19 over Catching Creek?
The structure is 77 ft (23.5 m) long with a longest span of 75 ft (22.9 m) and a deck 24 ft wide.
Who owns County RD 19 over Catching Creek?
It is owned by the County Highway Agency.